Quality first, at every step
Genuine material is not a claim you can make at the end. It has to be checked from the moment raw material arrives until the crate is sealed. These are the six checks every order passes through.
From raw material to dispatch
Raw material check
Plate, pipe and bar are received against the mill test certificate. Heat number, grade and dimensions are verified before anything is cut.
Grade verification
Alloy and stainless grades are checked by positive material identification, so a 904L order cannot be mixed with 316L on the floor.
Forming and heat treatment
Fittings are formed, forged and heat treated to the requirement of the material specification, with the heat number carried on every piece.
Machining and dimensional inspection
Bevels, faces and drilling are machined, then each lot is measured against the dimensional standard: diameter, wall, centre-to-end, flange thickness and bolt circle.
Testing
Chemical and mechanical results are reported on the certificate. Supplementary tests such as IGC, hardness, impact, radiography or dye penetrant are carried out when the order calls for them.
Marking, certificate and packing
Each piece is marked with grade, size, schedule or class, standard and heat number. Lots ship with a test certificate and export-worthy packing.
Questions and answers
How is material traceability maintained?
The heat number from the raw material certificate is carried on every piece through forming, heat treatment and machining, and is stamped on the finished product and printed on its test certificate.
What is positive material identification?
Positive material identification, or PMI, is a non-destructive test that reads the alloy content of a piece and confirms it is the grade ordered. It is the standard guard against mixed-up stainless and alloy grades.
What is a mill test certificate?
A mill test certificate reports the heat number, chemical analysis and mechanical test results of the material, and states the specification it complies with. EN 10204 type 3.1 is the form most buyers ask for.
Can a third-party inspector witness the tests?
Yes. Inspection by the buyer or a nominated third-party agency can be arranged before dispatch. State it on the enquiry so it is planned into the delivery time.